How we have changed our lives!
2022 year
Strengthening of the shelter building (blind area)
Replacement of windows in the building
Replacement of electrical networks in the building
Renovation of the kitchen area and arrangement of the kitchen (furniture, appliances, ventilation system)
Repair of the shower room and arrangement of the shower room (laying of water supply pipes, plumbing works)
Repair of toilets
Arrangement of living rooms
Arrangement of a playground and recreation area near the shelter building
Repair of the roof of the building
2023 year
Repair of the canopy over the entrance to the building
Replacing the floor on the ground floor of the building
Arrangement of additional toilets
Arranging a room for a food storage warehouse
Arrangement of premises for storage of things
Renovation of 5 more living rooms
Renovation of the lobby at the Shelteri
2024 year
Renovation of the laundry room and laundry equipment (laying water supply pipes, connecting washing and drying machines)
Repair of 10 more living rooms for IDPs
Plans for the future:
Repair of corridors and other common areas that have not yet been repaired
Renovation of the assembly hall in the shelter (a room for recreation, communication, holding various events and general meetings, and teaching children)
Renovation of a room for a computer class for children
Continuation of renovation of living rooms
Repair of the building facade